April 2004
Bottom requires preparation work before painting.
Must be cleaned and sanded prior to paint.
Boat was lifted with the crane in background and set on blocks
at Penn Terminal in Eddystone
Twin 30 inch counter rotating propellers.
A section of hull plate was cut out and replaced, due to severe rust.
Bottom is being sanded by Wayne Lynch.